Dili Airport Upgrade, East Timor

Client: East Timor Government 
Value: $3M 
Timeframe: 2006-2007 

Dili Airport is the international arrival and departure point for all East Timor air traffic. Due to an increase in security requirements, the project involved the airport upgrade of Heliport, runway and buildings as well as security and infrastructure requirements. Project involved the preparation of detailed design drawing and construction supervision. The project was delivered on time and within budget.

Key Project Achievements:

  • Design drawing completed to a high quality standard.
     
  • Project completed on time and to budget.
     
  • Infrastructure issues were dealt with using key stakeholder to determine the extent of risk and priorities infrastructure modifications as there were no existing service drawings.

 